Elevetor Max foundations, Ostuni, Italy
Elevetor Max was used as a sustainably profitable solution for the construction of foundations in Ostuni, a port city in the Province of Brindisi, Italy.
Thanks to its lightweight top formwork and height-adjustable vertical pipes, Elevator Max provided a time-saving and effortless construction process, done manually by only a few workers.
Elevator Max also replaced tons of backfilling and concrete with void space, achieving great savings in material, transport, and labor, which further improved the cost-effectiveness of the project.
The reduced amount of aggregates also minimized the use of virgin materials, which made the Ostuni project more sustainable.
Learn more
Elevetor Max
Elevetor Max Downloads
Elevetor Max video